Increase the Value/Return From Your Oil Well: Enquiry Form

In order for us to assess your existing energy project and provide a report on its enhanced energy yield potential, we need a range of specific technical data. Please fill out the form below with as much detail as you can provide. Once you have submitted the data we will assess your application and one of our personel will contact you as soon as possible.

Generated with MOOJ Proforms
* Required information.
Name of Company Making Enquiry * Please Enter Your Company Name
Name of Contact Person for this enquiry * Please enter the name of the company contact person for this enquiry.
Barrels Of Oil Per Day (BWPD) ? * Please enter the number of barrels per day currently being produced by your operation.
Million Cubic Feet Per Day (MCFPD)? * Please enter the number of Million Cubic Feet Per Day (MCFPD)
Cum. Oil Barrels Per Day(BBL) ? * Please enter the Cum. Oil Barrels Per Day(BBL)
Cum. Gas Million Cubic Feet (MCF)? * Please enter the Cum. Gas Million Cubic Feet (MCF)
Number Of Wells; (incl. Producing, Shut In, Injectors Wells, Disposal) * Please enter the Number Of Wells;  (incl. Producing,  Shut In,  Injectors Wells,  Disposal)
Is the Water Flooding Process For The Wells/Reservoir available? * Please choose yes or no.
Original Oil In Place : API Gravity Values? * For the Original Oil In Place please enter  API Gravity Values
Number Of Separate Reservoir And Wells Units? * Please enetr the Number Of Separate Reservoir And Wells Units within your project
Produced Water Salinity? * Please enter the measured value  of Produced Water Salinity
Injected Water Salinity (If Different to Produced water salinity)? Please enter the measured value of Injected Water Salinity (If Different to Produced water salinity)?
Water Injection Rate Barrels Of Water Per Day (BWPD) * Please enter the Water Injection Rate in Barrels Of Water Per Day (BWPD)
Highest Rate Injector Barrels Of Water Per Day (BWPD) ? * Please enter the Highest Rate Injector Barrels Of Water Per Day (BWPD)
Lowest Rate Injector Barrels Of Water Per Day (BWPD) ? * Please enter the Lowest Rate Injector Barrels Of Water Per Day (BWPD)
Water Injection System Pressure (PSI) ? * Please enter the Water Injection System Pressure (PSI)
Maximum Injection Capacity Possible Barrels Of Water Per Day (BWPD) ? * Please enter the Maximum Injection Capacity Possible Barrels Of Water Per Day (BWPD)
Source Of Injection Water? * Please describe the source of your injection water.
Composition Of Produced Water? * Please indicate the Composition Of Produced Water
Reservoir Depth ? (Feet/Meters) * Please enter the Reserve Depth (Feet/Meters)
Wells Depths If Different to Reserve Depth ? (Feet/Meters) Please enter the  Wells Depth If Different to Reserve Depth  (Feet/Meters). Number the wells and separate from measured depth by a comma. Separate each wells/depth entry by by semi colons eg:  Well 1, 300 metres; Well 2, 400 metres ; etc
Reservoir Thickness (Average Feet/Meter)? * Please enter the Average Reservoir Thickness in Feet/Meters (indicate which please) eg 100ft  or 200 metres
Overall Field Area (Acres) * Please enter the Overall Field Area (in Acres)
Producing Well Spread Average Distance Between Wells (in Feet/Meters)? * Please enter the Producing Well Spread Average Distance Between Wells (in Feet/Meters)
Injector Spacing Or Average Distance From Injector To Nearest Producer In (Feet/Meters) Please enter the Injector Spacing Or Average Distance From Injector To Nearest Producer In (in Feet/Meters)
Injection Pattern * Please choose Injection Pattern from the pull down list. (if you choose 'other' please give further info in the next optional question.)
If you chose 'other' please state type. If you chose 'other' in the previous multiple choice question please state injection pattern type not listed, or give further info.
Are There Tracer Or Reservoir Simulation Studies Available? * Are There Tracer Or Reservoir Simulation Studies Available? Please choose yes or no.
Reservoir Pressure (Psi) ? * Please enter the •	Reservoir Pressure (Psi) .
Bottom Hole Temperature? * What is the Bottom Hole Temperature?
Formation Name? * Please state  Formation Name
Reservoir Rock Type * Please state the reservoir rock type
Reservoir Permeability (mDarcy) * Please state reservoir permeability (mDarcy)
Oil Viscosity (Centipooise, cp) * Please state oil viscosity (Centipooise, cp)
Chemical Treatments History (e.g. Use Of Biocides, Scale Inhibitors, H2S Inhibitors etc) * Please state your chemical treatments history e.g.. Use Of Biocides, Scale Inhibitors, H2S Inhibitors etc. If a report is available please attach to separate email and leave us a note here.
For your chemical treatments history - are logs available? * For your chemical treatments history - are logs available?  Choose yes or no.
Are There Maps Available For Filed Area? * Are There Maps Available For Filed Area? Choose yes or no.
Details Of Structure Please enter details of structure
Any Data Available On Well Completion? Please supply any data available on well completion?
Email address for us to contact you? * Please enter the contact email address for this enquiry
Telephone Number for us to contact you? * Please enter your contact telephone number.
Location of well for which this enquiry is being made Please enter the location of the oil project for which this enquiry is being made.